Call: +44 (0)1482 661276 Email: info@rvhm.com
Call: +44 (0)1482 661276
Email: info@rvhm.com

TR Integrity Testing

TR Integrity Testing (PFEER)
Temporary Refuge Pressurisation

RVHM undertake TR Module Pressurisation & Leakage Testing to establish the TR integrity / leakage value, giving results that can be compared with HSE guidelines and the Platforms Safety Case.

A detailed report is produced & should the result exceed the HSE guidelines any areas of TR impairment can be identified using our thermal imaging equipment.
Such as:-

  • Bulkhead Corrosion
  • Bulkhead Transits
  • Door Seals
  • Duct Corrosion
  • Fire Dampers
  • Un-trapped Drains
  • Window Seals

The Offshore Installations (Prevention of Fire & Explosion & Emergency Response ‘PFEER’ Regulations 1995) places a duty on Offshore Operators to demonstrate compliance of all Temporary Refuges (TR’s) in meeting acceptable air leakage standards.

www.hse.gov.uk/offshore/trhvac.pdf

BS EN 15138:2007 – Petroleum and natural gas industries Offshore production installations – Heating, ventilation and air-conditioning.

For more information on TR Integrity Testing services from RVHM contact us today.